Closet getting close

The closet is almost done – it just needs some trim (door, baseboard and crown) and the ceiling to get finished.  The cedar is finished and the door is installed (although it needs to be trimmed down some to fit nicely).  The door is actually the other entrance door we removed from the room.  We wanted to change the direction of the swing so we could have a switch for the light (a switch couldn’t be installed on the left).  This door was a bit bigger, so the frame is fit a bit tight in the rough opening making the door not close nicely without a little trim.

This coming weekend we have our birthing class all day Saturday but between Saturday night and Sunday we should be able to get a good start on trim in the nursery.  Future weekends we’ve left wide open since we have no idea when the baby will arrive so we’ll be able to get the trim finished up this month for sure and then it’s on to painting!

Closet door installed!

Cedar installed on the left wall.

Cedar installed above the door of the closet.

I tried taking a picture of the subpanel in the attic but my phone is really acting up and I had to take pictures 3 times to get these.  I’ll get one soon though because it’s installed nicely with a knee-wall and will be permanent.