That’s right – we hired someone for another project. This time we decided we really want the porch to be stripped (lead paint) and re-painted before winter so we decided to hire someone to do that work. Interestingly enough I could probably do this stripping faster if we just hired a babysitter, but the work is getting done and I don’t have to do it so bonus.
What are they doing? We are having the soffit and frieze board around the top of the porch all done, the tops of the posts (the bottoms are being rebuilt by Ryan’s Dad). The soffit and frieze along the roof line on the driveway side of the house and the shingles in the peak (those are not being stripped but just sanded and then painted). Finally the siding next to the side door is going to get stripped and painted. It’s easier to show in pictures.
Rather than strip a lot of this, they are actually just taking down the wood and replacing it, fine with us and cheaper for them.
So that’s our house progress while we have no time to work on the house just yet. I have the shelves for the built-ins primed, ready to be painted. I also made one of the two curtains for the nursery so some progress is being made here and there. Hopefully this weekend will see more progress.