A quick sand and a second coat and the gym floor was done for the day this morning. Still a tinted coat, the third coat will be a clear coat.
Once the floor was done we dove back into the electrical. Now that we had daylight it wasn’t difficult to go into the attic to wire the upstairs hallway lights. A few hours later and we had both the stairway lights (sconces) and the upstairs light wired to their own 3-way switches. Lights lights everywhere.
After dad headed home I did cleanup. I’m surprised by how much we got done this weekend. Poor ryan is getting the cold I had last week so it’s going to be a quiet evening. Maybe some sewing if I’m not too tired to do anything but read 🙂