Front Hallway electric done

A quick sand and a second coat and the gym floor was done for the day this morning.  Still a tinted coat, the third coat will be a clear coat.

Second coat finished!

The gym floor with 2 coats!

Once the floor was done we dove back into the electrical.  Now that we had daylight it wasn’t difficult to go into the attic to wire the upstairs hallway lights.  A few hours later and we had both the stairway lights (sconces) and the upstairs light wired to their own 3-way switches.  Lights lights everywhere.

New switch at the bottom of the stairs

Switches at the top of the stairs

Switch by our bedroom door

After dad headed home I did cleanup.  I’m surprised by how much we got done this weekend.  Poor ryan is getting the cold I had last week so it’s going to be a quiet evening.  Maybe some sewing if I’m not too tired to do anything but read 🙂