Office completed

I’m calling it (mostly because we’re already moving stuff into the room and using it – it even has a rug ) 🙂

This last month we finished up the office which was mostly painting left.  We had Brad come and paint the trim mostly while we were on vacation and I painted the walls.  This past weekend I painted the sliding doors which were the last bits of trim paint until we put in the shoe molding (we’ll buy that in the spring and paint outside then just install it).  Ryan made some shelves for the built ins with leftover plywood but we didn’t have enough to finish them so he’ll finish that up another weekend.  We’ll also paint those outside when it’s warm enough.

A view of the built-ins when the final coat was drying 🙂

The other side of the room (this was before the sliders themselves were painted

Another view of the built-ins

Most of the shelves for one side built

The room is already packed with my office and sewing stuff plus about 1/2 of the kids toys from the playroom.  We have to empty the playroom out completely as that’s the next room to finish up.  That room needs crown molding installed, floors finished and painting.

For my birthday Ryan is going to build me a craft table for my sewing area.  More storage!  He loves it 🙂