This weekend was a nice relaxing weekend with some grimy demolition work. While Alex napped on Saturday (2 naps) Ryan got the ceiling of the master bathroom, small bathroom and laundry-room upstairs all demolished. During nap one I got the master bathroom ceiling demo all cleaned up (while Ryan did some dump runs). Then during Sunday’s nap I did the cleanup of the rest. There is still a lot of cleanup left, but I bagged up all the plaster and insulation (many many bags that have to be carted down to the truck and taken to the dump still)!. All the lathe is already in the truck or taken to the dump. Vacuuming has begun but will take a while, the insulation clogs up the filter really quickly so I did a quick first pass but have to clean the vacuum still and then start vacuuming the ceiling before doing the rest since it will just fall down anyhow.
Luckily we’ve gotten used to not using this area so we can take our time cleaning it up. It’s closed off from the rest of the upstairs containing the dust/debri which is nice and has back-staircase access.
Next up is framing in the small bathroom’s walls! We’d like to get moving on the small bathroom, well on everything but taking it one thing at a time 🙂