What a weekend we have had! Baby girl has been busy! Saturday morning Ryan got up early and made 2 trips to the dump to get rid of wood we had laying around making the outside look much better (all though we still need to mow!) Then he got the last small piece of crown installed and the rosettes so all the trim was installed!
Next up it was prep for painting, this included filling nail holes for the rest of the day when baby girl would let us (generally one of us worked and the other was on baby duty). Our final project was stripping the door frames in the tvroom – no more lead paint in the tvroom! Alex got lots of walks outside during that process and a little time in the back sewing room.
Today we started the day going out to breakfast at IHOP (our favorite breakfast diner was packed). Then we continued the trim work, caulking, sanding, sanding, vacuuming and sanding. Finally all the trim and built-ins are ready for primer!
Ryan has baby duty tonight so maybe I can get primer on the trim?!