Bathroom trim done

Last night after work I painted the final coat on the trim (hopefully final coat). I gave it a light sanding before painting so it’s nice and smooth this morning.

Trim painted!


I also installed the overhead light fixture since the ceiling is now finished. I still have to install the sconce lights and the real switches but one thing at a time 🙂

Bathroom light installed.


Tonight I’d like to seal the grout on the right hand side wall. I also want to get the dehumidifier set up to drain to the basement sink so we don’t have to empty out the bucket twice a day!