Project Updates

I went back and fixed some missing pictures in old posts and while doing so realized I never posted a finished picture of the wood shed so I have a few outdoor project updates.

Finished woodshed – on year 2 of storing our wood to dry!

Another project a few weeks ago was replacing the wood on the boat trailer – one side was completely rotten and broken so Ryan replaced it with new wood and new carpet. The other side still has to be replaced but it wasn’t in as bad a shape.

Boat trailer repairs

Back in December we got a Tesla Model 3 and that meant we had a little project to do – running a new wire across the entire length of the house and garage to install this guy …

Not the most fun winter project 🙂

And that brings us back up to this past weekend. Ryan replaced the window in the downstairs bathroom – we are finally starting the renovation of our most visible bathroom in the house!

It would be fully finished if it didn’t storm so much!

Then Ryan installed the trim around the basement door.

New door – needs new trim

Last week he used our new door to get rid of 1/2 of the dirt/concrete we have in the basement freeing up a ton of space. 2 more small piles to go on that cleanup project and then we can finally use our basement like normal people (instead of piling tubs around piles of dirt)