More progress on the master bedroom this last weekend! First up – fun thing – since I finished installing all the outlets in the master bedroom and hallway last week I was able to install the LED strip lighting in the linen closet :
It takes a power supply, switch and this strip of LED lights that are adhesive (tape) that I ran all along the inside trim of the closet (all the way around the top) so we get great light in there! I had planned for this so the outlet was installed in the closet up high for just this. There’s an outlet near the floor for roomba too.
More importantly though was Ryan’s progress. Saturday his Dad and he finished up the floor in the bedroom!!!
The little spot at the end there is where the built-in bookcase will go (so plywood base) – there is one on each side of the closet. Speaking of closet, then they got the closet door installed!
On Sunday Ryan got the threshold to the master finished and installed the bedroom door!
The plan for this weekend is to get those built-ins done and a good start on trim. The windows are done so it’s door trim, baseboards and chair rail like in the girls’ rooms.
I’m hoping by the first weekend of April the trim is done and we are sanding/polying the floors in there! Then it will be painting and we can move in by the end of April? I’m trying to be conservative because things always come up. We have a vacation planned in April but if the weather is nice I think Ryan wants to work on the front porch we are adding so that we can get the new roof installed in May. SO many projects to do!