This past weekend was a busy one!  Thursday night Ryan finished installing the trim in front of the tub and I got all the trim caulked and holes filled.

Friday Brad sanded and primed all the trim.

A view of the tub trim finished too! Most of that is removable in case we ever need to get under the tub to the pump.

A view of the tub trim finished too! Most of that is removable in case we ever need to get under the tub to the pump.

Where toilet and vanity will go

Where toilet and vanity will go

Door

Door

Friday night Ryan and I finished the master closet ceiling bead board installation and moved tools downstairs.  The ceiling isn’t finished but we wanted to get the bead board finished so it could be moved downstairs.

Ceiling of closet

Ceiling of closet

Saturday after a trim to home depot for supplies and more cleanup, Ryan and his dad started putting down the new floor in the master bedroom!  It’s hard to work in a room where you’re laying the floor, each time they cut and router they have to vacuum etc but we have no other place to do that part of the work!

By the end of Sunday they had the master closet and about 2/3 of the main room floor finished!  We have to clean it all up and move the pile of wood so this weekend Ryan can finish it up.  Once the floor is done it’s on to door installation and trim!

Floor!

Floor!

This side of the room is done

This side of the room is done

This pile of wood has to be moved so it can be finished :)

This pile of wood has to be moved so it can be finished 🙂

While the guys did the floor on Sunday at naptime I got the door knobs installed on the newly painted doors and filled up my new linen closet (Ryan cut the shelves Sat night for me)!  Finally a closet with a door (this may be my first ever finished closet that has a door on it already!).

Not many linens but it's my first closet for bathroom supplies. And finally towels are out of the hallway!

Not many linens but it’s my first closet for bathroom supplies. And finally towels are out of the hallway!