Electrical

The weekend before christmas I got to work on the house a bit!  Suzanne watched the girls on Sunday and we got some wires run – fan boxes installed in 2 of the 3 bedrooms (and hooked up to switches!).  The benefit right now is that we finally have light in those rooms (previously no lights)!

We’ve decided to take down all the exterior wall sheetrock so we can properly do spray foam, we had done enough demo that it’s not really that much more.  In the master it’s 1 wall, in the master bath it’s 1/2 of a wall, in Bella’s room it’s 2 walls (the most) and Alex’s room it’s one small wall.  Because of the dormer walls and bathrooms already being demo’d – it’s not much more.  This way we can do the outlet wiring a bit easier (mostly I just need to confirm the wiring is good and add some outlets to the dormers).

No pictures but progress was made.  I’m looking forward to resuming some work – maybe Friday (holiday).

I hope everyone had a wonderful Christmas and is ready for the New Year!