Demo

The weekend before last we spent all day Saturday working on filling our dumpster … so bathroom demo time!  We got a good portion of the upstairs bathrooms demo’d and I took up carpet tacks and trim off of 2 of the bedrooms upstairs when there was no room in a bathroom for 2 people 🙂

Door frames removed from closets – this one is ready for a dormer!

Back bedroom – I got most of the trim and all carpet tacks up in here. Not a lot to do in this room hopefully over all.

Master bathroom – toilet and sink/vanity removed

Small bathroom – sink and toilet removed

Looking from master bathroom through wall to smaller bathroom (where sink and toilet were)

We’re going to get the boat out of the water this week and get it ready for winter (clean it out, get it winterized and covered).  Friday we meet with the HVAC guy that did the blower test on the house to get a quote on heating system options and plans.  That’s our first thing we need to get done – heat – before it gets cold!