The new year started out about the same as last year – a weekend trip up to the NH house to work 🙂  We had Alex with us so I mostly just spent time with her and Ryan worked.  He got the final coat of spackle on the upstairs hallway (above the staircase).
During ‘naptime’ – otherwise known as Alex screaming or talking in her bedroom time – we got the first coat of paint on the 2 bedrooms (the back room and master). Â We are playing around with color, we bought white paint and we’re tinting it with the leftover orange from the gym to give it just a bit of yellow. Â The back bedroom came out perfect, the master I think had a bit more orange so we’ll lighten the bucket a bit more before second coat time and then save the leftover for touchups.
At this point I think we’re still planning on finishing up 2 coats of paint before we install trim so we only have to cut in on the trim painting. Â The ceilings are done so we can install the heat vents and lights/smoke detectors when we have time. Â One big thing holding us up right now is getting rosettes stripped. Â We can’t install all the trim until we have rosettes and they need to be de-nailed and stripped – ugg.
We’re hoping to work the next 2 weekends – maybe even get a kid free weekend in there. Â We’ll see. Â Lot’s to do and goes faster if both of us can work!