Friday Saturday progress

Friday our contractor finished the upstairs hallway flooring!

Hallway floor

Our neighbor finished spackling the livingroom over Friday and Saturday and got the linen closet sheetrocked.  Our contractor got the closet door installed and Ryan finished installing the bathroom trim.  I sanded and primed all the trim on Saturday evening.

Linen closet

Closet sheetrocked!

 

A view of the baseboards primed

Door trime!

 

Small bit of baseboard on the sink side.

I’m hoping to get some work done in the evenings this week, specifically some electrical so that our neighbor and contractor can sheetrock the front hallway (finish sheetrocking it) on Friday.  We hope to continue with 1-2 days a week of their time so things progress along more steadily than when it’s just us working!