Friday our contractor finished the upstairs hallway flooring!
Our neighbor finished spackling the livingroom over Friday and Saturday and got the linen closet sheetrocked. Our contractor got the closet door installed and Ryan finished installing the bathroom trim. I sanded and primed all the trim on Saturday evening.
I’m hoping to get some work done in the evenings this week, specifically some electrical so that our neighbor and contractor can sheetrock the front hallway (finish sheetrocking it) on Friday. We hope to continue with 1-2 days a week of their time so things progress along more steadily than when it’s just us working!