Well I was supposed to take last friday off to paint/work on the house but Alex got sick Thursday night and had to stay home friday so I worked while she watched Thomas on TV most of the day (not the WHOLE day, although she did that most of the morning) 🙂
Anyhow, so the weekend came and we made some progress on the bathroom, Ryan got the last small pieces of cement board cut and installed around the window in the shower. Â We caulked all the joints in the shower, we got the first coat of spackle/tape on the ceiling and walls and I did a little painting (touchups at the peak and the half moon windows).
I took today off of work (mostly) since I missed last friday. Â I got another coat of spackle on the bathroom walls/ceiling and then got some paint on the outside of the porch soffit/posts. Â I didn’t get very far on the porch, I had to caulk most of the posts on the outside first which slowed me down.
The halfmoon window I got painted was re-made by our neighbor. Â He stripped down all the wood, put it back together and cut new (re-used from other windows) glass, then glazed and primed it. Â He’s working on the last half moon window now, the front one I just kept installed and did a quick fixup job in place. Â This one he did came out MUCH nicer!
This weekend we hope to get the shower water proofed (red-gard), and the walls/ceiling finished (spackling/sanding). Â The following weekend hopefully we can tile then. Â Let’s see how that plan goes.