Well my last week off of work and Alex got a cold – then passed that cold on to Ryan and I for the weekend. Lovely. So we’ve all had very little sleep (Alex is up every 2 hours at night when she’s sick evidently and prefers to be held). Luckily she’s mostly been in a good mood while sick, it’s just the lack of sleep that’s making me grumpy 🙂
Anyhow, even sick we couldn’t take the weekend off – the tvroom is on track to get done soon and with the couch coming Friday we made it a priority to get the trim done on the walls the couch will block.
So Friday night we sanded the 2 walls the couch will block and I got the first coat of trim paint on them. Saturday we got the rest of the trim sanded and sanded the paint on those 2 walls. I got the second coat of paint on the trim the couch will block Saturday night. So the rest of the trim needs to be painted still but the couch can go in once those 2 walls get a coat of paint (and the ceiling).
Sunday we wired the new furnace and water heater in the basement that will get hooked up Monday. The gas line is officially in (Friday) so we will be running off gas this week hopefully!
Uh oh – Alex is up (and sniffly) – time to go!