Well it only took forever (4 separate times actually) but the priming in the tvroom is done! Friday during one of Alex’s naps I was able to start priming again, getting a good portion done (2 doorways and some baseboards). Then after Ryan got home I continued that evening, getting all of the crown finished, the baseboards and doorways all done.
Saturday we had an outing at Kimballs, but in the late evening I was back to it, priming the window trim and the built-ins (just the brush, saving the rolling for sunday). Then on Sunday I got the roller out and finished up the priming of the built-ins! Too bad it all needs to be sanded before the first coat.
The goal tonight is to get a final coat of poly on the floor since we are going to buy our couch today and get it delivered in 2 weeks maybe??
Once Alex wakes up from her nap it’s out to lunch and couch shopping! Then back to house work this evening.