Stomach bugs…

What a strange weekend we had.  Saturday I was feeling so much better from my cold finally so we worked on the house (knowing we had only one day this weekend since Ryan had a bunch of work work to do on sunday).  First we ran to the dump to drop off the final loads from last weekend, then over to pick up our new windows from Marvin.

Home again we decided to continue the demolition in the upstairs diningroom so we could put up the new wall for the hallway.  It was very messy demo due to the insulation in the ceiling and we only did half of the ceiling (just enough to put up the new wall), since the master bathroom will not be done for a long while and i’d rather get the floor down before we demo the rest (it’s not fun cleaning demo debri from the upstairs and downstairs due to cracks in the subfloor).  The demo went pretty quickly (poor Ryan had to do all of it) but I helped with bagging it all up and now we have another dump load for another weekend waiting outside (hopefully before it snows!).

With that completed I spent about an hour vacuuming up the exposed insulation and the debri.  Finally we started the new wall.  We left a few of the studs out so there’s a makeshift doorway to get through for now (since we’re not finishing the bathroom for a while we’ll use it as our ‘guest room’ while we work on the nursery – need to put the bed someplace!).

Finally with the wall in and secured to both the upper and lower joists it was time to remove the jacks to see if the floor had any less movement or not.  It has definitely improved, it still moves (the joists included) if you jump on it so we may need to take future measures but there was definite improvement over before.

Ceiling demolition

 

And the other side

New wall started (still needs 2 more studs and blocking but it's enough for now).

Unfortunately on Sunday, even though we knew Ryan wouldn’t be able to work on the house I still had hopes to get a few things done but I woke up with a sore throat and headache (cold really doesn’t want to go away).  The sore throat was probably due to not drinking enough water on saturday because staying hydrated sunday certainly helped.  So while Ryan worked I crashed on the couch with some Pride & Prejudice and stitched as well as napped.

Stitching Progress update. Making good progress on this piece.

Then the stomach bugs came to our house.  Kind of.  Fitz was the first to go down.  Sometime after dinner he got sick (right in his bed too), and it was horrible.  He continued to get sick 4 times total over the next few hours and we were on high alert for any sign he might need to rush outside.  I have a nice big load of dog blankets that need to be washed (waiting to see how today goes first).  Poor Fitzy.  I finally took away his water (since he was just throwing it back up) and he was okay through the night.

Of course then later in the evening I got a bit of a bug (or just an IBS attack).   I was up till 3am with uncontrollable shivers every 20 minutes or so.  Not fun.  Poor Fitz and I are quite the pair.  So I decided to work from home today due to my lack of sleep and wanting to be able to keep an eye on Fitz (who is acting fine but wants to eat grass now – can’t find any!  – which makes me think he’s not better yet).  He is allowed a little water (although he hasn’t touched it yet) and I gave him some yogurt with peanut butter  for breakfast so we’ll see how that goes.  If he doesn’t get sick he’ll get rice and chicken for dinner tonight.  Hopefully whatever it was has passed and he can go to his new daycare tomorrow.

I myself am feeling better, I feel like I always do after an IBS attack so that’s probably what it was (from eating too much yesterday?).  I’ll take it easy with what I eat today and stay hydrated.  I should be able to work most of the day (maybe a short nap at some point).  And poor Fitz is stuck in the room with me so I can keep an eye on him.

That was our weekend – so much fun 🙂  I am very excited about the house progress, we can now put down hardi-backer in the master bathroom area and make it into a temporary guest room with sheets for walls  and the bed moved in there.  Then the nursery clean out project begins and eventually we’ll demo that room and get it going!