Excluding shoe molding (which is very very last) – the trim is all installed in the 2 bedrooms now! Ryan worked Fri, Sat and Sunday and got it all installed! There is SO much trim! Brad spent last week painting Bella’s room and her trim is just about done (1 coat needed on a few small things, then touchups on the wall paint!). I spent a little time this weekend (nap times) caulking and filling holes then last night finished the caulking (still a lot of holes to fill!)
And on to Bella’s room progress..
We have a crazy plan so we can move in the weekend of the 20th!
- Tue – Fill holes
- Wed – Sand/vacuum
- Thur – prime all trim
- Fri – sand the trim AND Sand the floors
- Sat – finish sanding and poly coat 1
- Sun – sand/vacuum/poly coat 2
- Mon – sand/poly coat 3
- Tue let it dry
- Wed – paint trim
- Thur – paint trim
- Fri – finish painting?? (trim, wall touch ups etc)
- Sat – install shoe molding
- Sunday – move in!
- Monday – back up day to move in 🙂
The days (Sat-Mon) that the floors are being poly’d are going to be short days for work upstairs so that gives us time to do work downstairs in prep for moving in. We have a wall to build to hang the tv on, things to move to the basement, the kitchen to setup with better storage etc. AND siding to put up IF it’s not raining (looks like rain though).
I’ll let you know next week how we’re doing… cross fingers for us!