Progress continues quickly as we finished up all the prep work for insulation and they came out last Wednesday to start the job (they are finishing up today with a few small touch ups and cleanup). We are seeing a huge improvement in heat retention even with the heat turned off this weekend (we turned it off so we don’t get any of the insulation spray fumes in the air handlers/filters). We used the fireplace this weekend and today it was still 50+ degrees on both floors! Once we start running the heat again it will barely have to run!
A few pictures I took last week…
All 2×4 walls have 1.5″ of closed cell, then open cell to fill. The 2×6 (new) walls in dormers are just open cell. The attic and basement rim joist were also all sprayed. The only part of our house without spray foam is now the addition section (over the slab) which is the livingroom, washer/dryer room and the un-insulated garage.
Ryan and his dad worked on the house this weekend. They got the ceiling between the old ceiling and new dormer section firred out, ready for sheet rock :
They also got all the rest of the frieze board/trim installed on the dormers as well as the front of the soffit corners covered with white aluminum!
The hope was to do siding last weekend but the siding that arrived was the wrong kind so we are now waiting 2 weeks for a special order siding. In the mean time we are getting ready for drywall upstairs – our plumber has started running the lines for the bathrooms and Ryan is finishing up the last bit of framing. I have a tiny bit of electrical (hooking some lines up to the panel box) and we should be ready to go. I think if we were doing the drywall ourselves we’d just be going on it already – our hold up is that we hoped to hire someone because the taping/spackling would go so much faster if it wasn’t us doing it. We’re not hearing back from the one person we found that could do it so we may just have to do it ourselves and hope we can do it quickly enough.