We had a very productive weekend. We got 2 beams (doubled LVLs) installed with jacks – the real posts are on order so we are waiting for those. In the mean time we were able to start jacking up the original beam and our 2 new beams. We can’t just jack up all the sag at once, just a little at a time so most nights this week we’ll go to the house and lift it a bit each time. We anticipate lots of cracks in the sheetrock and popped tiles but that’s a good sign and all repairable down the road!
A view of most of the beams – we have one more to install on the other side of the stairs but this is a great start.
A productive weekend for sure. Next weekend is camping!!! Can’t wait and hoping for continued good weather.