The last two evenings after Alex went to bed I painted the trim in the bathroom. This was a LOT of cutting in but it’s done! Now I just have some touchups of wall paint to do from caulking mostly and we’ll install the vanity tonight probably. Jason is going to come out any day now (snow held him up today) to do the finish plumbing and then we’ll have an upstairs bathroom again! Unbelievable.
Our contractor came over on Monday while Ryan was home and started getting the diningroom prepped for drywall. He firred out the wall by the built-ins and put up the rough nailers for the beams/boxes we’re going to have on the ceiling. All that is left is to finish up the electrical in the diningroom and then we can get that sheetrocked mostly (we’ll leave some of the ceiling open so the plumbing can be finished later on).
Hopefully this weekend will see some more progress in the livingroom, i’m anticipating some trim work? Our contractor should be back friday to strip the paint off the archway in the livingroom, and our neighbor should be coming over to do some sheetrocking (front hall?). Looking forward to it!