We made some good progress Saturday, Ryan was up very early and started working on removing the pipe for the gym radiator so he could patch the floor. So the first thing I got to do after waking up was to bag up the asbestos – fun 🙂
Once the pipe was removed he worked to patch the floor while I finished caulking the crown molding and spackling. We had some leftover oak flooring he used to patch the floor.
After lunch we made the door frame after picking out a door (we have since switched the door we picked but the same door frame we made still works.
Once the door frame was made I sanded and primed the crown molding before cleaning the house. We spent the evening over at Uncle Pete’s to celebrate Maia’s birthday with the girls.
So here are some pics and my updated gym project list…
Updated list:
- Patching the gym floor (where we remove the radiator pipe)
- Patching the floor all around the edge (no need – baseboard will cover it)
- Installing the door frame (and making one or stripping one down)
- Installing the door trim
- Installing the baseboards
- Finishing the ceiling (spackle the corner, prime it, paint the final coat on the whole ceiling)
- Sanding and caulking the crown molding
- Priming and painting the crown molding
- Sanding and caulking the window trim
- Painting the window trim