The day is going pretty much as planned. I’m just sitting down to lunch while the caulk dries. So far today I’ve gotten the paint in the bathroom touched up, the real switches installed and the caulking done.
Once the caulk is dry I will seal the tile and then it’s off limits in the bathroom until the sealer is dry.