Vacation – Day 2

A wonderful second day!

We started out the day getting the trim up in the bathroom – I got it sanded down and Ryan put it up.

Ryan installing new plinth blocks

Putting up the trim I stripped down

The left side trim up

Once the trim was up Ryan started tiling.  He had to do all the tiling himself so it was up and down to/from the basement to cut the tiles 🙂  While he did this I primed the gym and started stripping the bathroom door.

Tiling up the wall on the right

The right side done in time for a lunch break

Tiling up the left side

The wall tile complete! And the door I started to strip.

And here’s what I did during the tiling project 🙂

Gym - all primed!

Another view

Tomorrow is Ryan’s birthday.  We plan to take it easy most of the day.  Ryan may tile the bathroom floor but we have to find a threshold/saddle first – we didn’t like the ones at home depot but Lowe’s selection wasn’t much better so we may have to go with what Home Depot had.