Dormer Update (late)

First off – Ryan did an amazing job closing up the second dormer quickly.  On the following Saturday he finished the roof on it (Nov 14) while I was out of town.

The windows arrived last friday and that night Ryan got the first one put in already!  He put the second one in on Saturday and got them sealed up with trim on Sunday.  He also installed the small window over the garage so Alex’s room has 2 new windows now!  Both dormers have plywood flooring now too.

New window friday night

Flooring in dormer

Other dormer floor

Windows installed on both dormers!

I was away with Bella Saturday night through Sunday but got photo updates as the trim went up!

Window has trim!

The second with trim

The small window replaced with new trim

We are using Azek for the trim around the windows.  The brown siding is vinyl and we haven’t found a perfect match yet (we found matching style but no colors match perfectly) so we haven’t pulled the trigger on new siding yet for the dormers.

Our HVAC equipment is all here and Ryan’s cousin is starting on duct work this week (and they got the attic unit up into the attic last night).  Progress everywhere – hopefully soon the outside stuff will be done and we won’t be so weather dependent – it has been COLD on the weekends!