Jacking up the house

We had a very productive weekend.  We got 2 beams (doubled LVLs) installed with jacks – the real posts are on order so we are waiting for those.  In the mean time we were able to start jacking up the original beam and our 2 new beams.  We can’t just jack up all the sag at once, just a little at a time so most nights this week we’ll go to the house and lift it a bit each time.  We anticipate lots of cracks in the sheetrock and popped tiles but that’s a good sign and all repairable down the road!

A view of most of the beams – we have one more to install on the other side of the stairs but this is a great start.

The far beam was a ton of work – we couldn’t have done it without using dad’s sheetrock lift – that was his great idea!

We also got our couch out of storage and now have a place to rest in the livingroom!

A productive weekend for sure.  Next weekend is camping!!! Can’t wait and hoping for continued good weather.