Some quick updates

A mid-week visit up to the house for some appts and I have a few more pics to share and a tiny bit of progress updates as well.

First some more pics of what was done over vacation …

Another shower view

The painting continues smoothly and he will be finishing up what he has time for this weekend, anything left will be for us unfortunately but I think he’ll have almost all the trim done (that’s already installed).

Washer/dryer stand ready to carry those up and install

I still forgot to take an outdoor (front porch ceiling) picture – this weekend I will hopefully remember but I did get a pic of the floor in the master bedroom that Ryan fixed up (it had damage and a hole from the radiator).

Repaired floor in cupola!

And the electric in the bathroom is officially done – of course I forgot to take a picture of the ceiling fan but the outlets and vanity lights are in and everything is working/wired up.

Outlets and switches (need another double switch plate…

Vanity lights … so…

Turns out that when they say the vanity light is 24″ across they measure the edge of the metal NOT the glass!  Since our sinks are 12″ in from the sides and we wanted the lights centered I thought I was safe with a 24″ wide light.  Not so much it turns out 🙁  Luckily I think I can just buy different glass and change that out for a small fee instead of using this flared design.  I’d have to have to unwire and replace them completely as it was a pain to get up of course!

That’s it, it was a short trip and I mostly just worked remotely while there.  We’ll be heading up tonight for another weekend of work including grouting the bathroom, putting up the bathroom trim, spackling the last wall in the diningroom (me) and working on the banister maybe or hanging ceiling fans.  We are going up next weekend too so some of that may happen then.