Another work weekend

This weekend we brought along the peanut and she was a big help 🙂

I found her like this when I came downstairs from doing something – she’s ‘making lists’ and has her tools ready.

Don’t ever change alex – you are too perfect 🙂

We had a busy day Saturday.  Alex and I ran to home depot while Ryan started with some spackling.  We have this tough to reach spot at the top of the staircase (ceiling and walls) that is taped but not finished.  Ryan got a good coat on that area.

Doesn’t this plank look totally safe?

We also managed to get 2 coats of paint on all of the ceilings that were ready – that’s the 2 bedrooms and the hallway (minus the stairway area).  Next time we’re out I can do smoke detectors and lights now!

Ceiling painted – 2 coats!

Back bedroom

Hallway ceiling

Our neighbor was over to work and he sheetrocked (which included some 2×4 installation) the attic stairwell – we are only doing the first section to the 2x4s they have up because the attic is unfinished but this way when you open the hopefully soon to be installed attic door, it opens to a seemingly finished stairwell.  We will probably leave this untaped since the rest is unfinished but we’ll see.

Attic stairwell – calling it done for now

All in all we had a productive weekend when you consider 6 hours of that is driving 🙁  Sunday we ran errands then drove home after packing up.  Attempted to drive during naptime (no nap).  All well.

Now it’s time to enjoy Christmas and family.  In the new year we’ll return to the home building 🙂