We have WATER

I can’t really say a fully working bathroom JUST yet because we are waiting on some minor necessary things like a toilet seat (Thurs), Shower curtain rod (Fri) and we need to buy a mirror.  However the bathroom is partially useable and Alex even took a bath in her new tub last night which she (and I) were very excited about.  THANK YOU JASON for fitting us in on a weekday!

Jason came out and finished up the plumbing, it included hooking up the drains and faucets and toilet, but also hooking the drain up to the main drain in the basement and venting everything up the original vent stack out the roof.  It all looks and works great!

Working sink!

Working shower/bath and toilet just missing a seat cover

So most things are either here and need to be hung (rods) or ordered and on their way.  The mirror however we need to buy, we originally got a medicine cabinet but it’s a bit too large to let the lights work right (maybe we should have hung the lights higher?).  Instead we’ll return that and get just a simple mirror which will look great.  If this wasn’t such a crazy busy week at work I’d say maybe by end of week it will be ‘finished’ but I’m betting more on next week because both Ryan and I are working till midnight each night this week with no real end in sight until the weekend.

Still looking forward to the weekend work of sheetrocking that is supposed to happen!  Very excited to see if that works out, that ceiling over the stairs is going to be super hard!