Floor finished

As he hoped our contractor was able to finish laying in the floor by the end of the day Tuesday!  So the floor and the sheetrock in the cupola are done!  And it’s not even the end of the week yet, we still have Friday (and today) for more progress.  Our contractor is coming back today most likely to start on the 1/2 walls and a few small areas of floor that need patching.  Friday hopefully most of the sheetrock can be finished in that room entirely and even part of the front hall.  Then we’ll take a break on progress so we can have our tree up and use the room for a week or two.  Then we’ll get back to finishing the room (taping/spackling/trim etc).

Floor finished – all original flooring from this spot and upstairs that we removed previously.

I’m very excited to use the room for xmas.  And pretty soon we’ll have a fully useable finished playroom!