Surprisingly they only missed a half day last week due to rain, although they couldn’t paint with the constant threat of rain.  Great progress was made when I came home Friday morning and I’ll just explain through the pictures since I wasn’t here to witness it anyhow 🙂

Scaffolding went all the way up the tower and the crown molding and soffit were stripped down!

The attic windows were all installed and the window caps for the second floor windows were installed with copper, all panels around the lower windows are also done (before they put up staging). Primed as well.

The bumpout with scaffolding removed. We still have to add the red molding over the lower windows and paint inside some of the center panels.

New attic windows really brighten this attic space!

And the other side.

I don’t think I have a picture of the end of friday progress, they got the window caps on the attic windows, all the way around with copper.  They got the casings and sills for the attic windows all made, cut and primed, ready to be installed.  The goal is to get above the attic windows done completely, as well as down to the sill of the attic windows.  Get that caulked/primed/painted, add the red molding and then lower the staging down to just one level to do between the two sets of windows.  With the long weekend coming up, hopefully the weather holds so they can get this done like they want.