Day 2 – windows are in

It sure was nice to come home to some great progress!  They got 5 windows flashed and installed today.  They also removed some more siding so we could see what the original cupola panels looked like – very interesting.  I’m a little worried we don’t have windows for the top of the cupola yet.  I’ve been having trouble getting such small double (or single) hung windows.  I’m going to talk to our contractor tomorrow about calling Harvey windows and see if they have any, but even then it’s 2 week lead time.

Looking good!

bumpout windows are also in!

Interesting panels revealed

And the interior….

Bumpout (this will become the master bathroom.

Laundry room (left) and bathroom (right).