Finally a weekend to work on the house!

And already we’ve made 2 trips to home depot 🙂  Although Friday night’s trip to home depot was to just get some weather stripping for the front door and some putty for the outside electrical entrance into the house (to make it water tight).

Today Ryan started removing the baseboards in the livingroom so we could wire, the sections that he removed and then drilled, i cleaned up and wired.  We’ve got one more section (behind the radiator) to do and the livingroom outlets will be done.  We also measured and bought the wire to run to the attic subpanel.  We decided the diningroom doesn’t need any outlets on the small section of exterior wall if we keep the current outlet locations in there.

What will be the fourth and fifth outlets

Feed and first 2 outlets

We made a trip to the dump to finally get rid of the last of the wood from the porch project that’s been laying around.

I ended the day by getting 3 boston butts brining (to slow cook tomorrow for pigging out at work!).  Then I made up a chocolate pie for tomorrow (just to enjoy).

Hopefully we can run some more wire tomorrow, finish up the tvroom outlets, run the subpanel wire and maybe wire the door bell.  Next weekend we can start on the front hallway/staircase which is mostly lighting.  It feels good to be able to work on the house again!